Temp greenhouse location. Install drainage system.
(07/30/03) |
Ground breaking. (07/29/03) |
Temporary greenhouses: Pouring concrete footings
and floors. (08/12/03) |
|
|
|
| Temporary greenhouses: Pouring concrete footings and floors. (08/12/03) |
Temporary greenhouses: Construction using material from a decommissioned greenhouse. (09/09/03) |
Temporary greenhouse ready to go.
(10/5/03) |
|
|
|
| Mudd-to-greenhouse connector demo and preparing trees for movement (arrow).(10/17/03) |
Preparing trees for transplanting. (10/17/03) |
Greenhouse demo. (10/17/03) |
|
|
|
| Greenhouse demo. (10/28/03) |
Greenhouse demo. (10/28/03) |
Greenhouse demo. (10/28/03) |
|
|
|
| Greenhouse demo. (11/01/03) |
Drilling the 3-ft x 50-ft holes for I-beam installation along western edge of garden. (12/9/03) |
Edge of garden secured with pilings. Note drill bits (3-ft diameter) in foreground used for drilling holes for pilings. Earth removal from western edge of site along University Ave. ( 12/23/03) |
 |
|
|
| Earth removal from western edge of site along University Ave. (12/23/03) |
Earth removal from western edge of site along University Ave. (12/23/03) |
Earth removal from site (looking north). Approximately 10-ft removed so far. (02/01/0 |