Carolyn Lynch Laboratory Construction  

BIOLOGY (Click pictures below to view a larger photo.)

Temp greenhouse location. Install drainage system. (07/30/03)

Ground breaking. (07/29/03)

Temporary greenhouses: Pouring concrete footings and floors. (08/12/03)

Temporary greenhouses: Pouring concrete footings and floors. (08/12/03) Temporary greenhouses: Construction using material from a decommissioned greenhouse. (09/09/03) Temporary greenhouse ready to go.
(10/5/03)
Mudd-to-greenhouse connector demo and preparing trees for movement (arrow).(10/17/03) Preparing trees for transplanting. (10/17/03) Greenhouse demo. (10/17/03)
Greenhouse demo. (10/28/03) Greenhouse demo. (10/28/03) Greenhouse demo. (10/28/03)
Greenhouse demo. (11/01/03) Drilling the 3-ft x 50-ft holes for I-beam installation along western edge of garden. (12/9/03) Edge of garden secured with pilings. Note drill bits (3-ft diameter) in foreground used for drilling holes for pilings. Earth removal from western edge of site along University Ave. ( 12/23/03)
Earth removal from western edge of site along University Ave. (12/23/03) Earth removal from western edge of site along University Ave. (12/23/03) Earth removal from site (looking north). Approximately 10-ft removed so far. (02/01/0