BIOLOGY (Click on the pictures below to view a larger photo.) |
East side of building is still open wing
building.(1/28/05) |
West side of building with insulation. (1/28/05) | West side of building completely enclosed.(2/19/05) |
| South side of building being enclosed. (2/19/05) | View of second and third floors from north side. There is an amazing amount of air handling ductwork in this building.( 3/12/05) | South side being enclosed.(3/30/05) |
| Preparing to install glass on garden-side of building. (3/30/05) | Brickwork (yellow arrows) begins on the south west face of the building.(3/30/05) | Scaffold in place on western side of building to facilitate brickwork. (3/30/05) |
| Andy Binns, Carolyn Lynch and Peter Lynch on site during excavation.(4/1/04) | Windows almost complete on southeast portion of building. (5/27/05) | Brick installation on south side of building. (5/27/05 ) |
| Brick and windows complete on southwest portion of building. (5/27/05) | Most of the brick and windows are now installed on west side. (6/12/05) | New retaining wall along Garden south side. (6/12/05) |