Carolyn Lynch Laboratory Construction Scrapbook 

BIOLOGY (Click on the pictures below to view a larger photo.)

East side of building is still open wing building.(1/28/05)
West side of building with insulation. (1/28/05)

West side of building completely enclosed.(2/19/05)

South side of building being enclosed. (2/19/05) View of second and third floors from north side. There is an amazing amount of air handling ductwork in this building.( 3/12/05) South side being enclosed.(3/30/05)
Preparing to install glass on garden-side of building. (3/30/05) Brickwork (yellow arrows) begins on the south west face of the building.(3/30/05) Scaffold in place on western side of building to facilitate brickwork. (3/30/05)
Andy Binns, Carolyn Lynch and Peter Lynch on site during excavation.(4/1/04) Windows almost complete on southeast portion of building. (5/27/05) Brick installation on south side of building. (5/27/05 )
Brick and windows complete on southwest portion of building. (5/27/05) Most of the brick and windows are now installed on west side. (6/12/05) New retaining wall along Garden south side. (6/12/05)
     
     